Data center · opened June 15, 2020

NWK1 Newark

241 Capstan Street, Newark, NJ 07114

Critical IT
14.4 MW
Data halls
95,400 sq ft
Networks on-net
19
Halls above BFE
8.4 ft
Dry Floor above BFE
25.1 ft

NWK1 is the building we would have built in Secaucus if we had been allowed to start from nothing. It stands on 412 driven piles two miles east of the airport, among the warehouses that serve the port, and it was designed from the first sketch around a flood line. Level 1 opened in June 2020. Level 2, eight private suites on the Dry Floor, opened in May 2026.

Where the water is, and where we are

NWK1 was designed in 2018 around a design flood elevation of 17.0 feet. Its ground floor slab is at 19.4 feet, on structural fill and 412 driven steel piles, so the building stands 8.4 feet above the base flood elevation without a wall around it. The generators and electrical rooms are at 20.6 feet.

When we raised our design flood elevation to 18.5 feet in 2022, NWK1 already cleared it by almost a foot. The only part of the site below it is the loading dock, at 12.6 feet, which has its own deployable barrier to 19.5 feet. Level 2, the Dry Floor, opened in May 2026 at 36.1 feet.

Section through NWK1, elevations in feet above NAVD 88 Site grade (average): 8.1 ft; High-water mark, October 30, 2012: 10.2 ft; Base flood elevation (1% annual chance, Zone AE): 11.0 ft; Loading dock: 12.6 ft; 0.2% annual chance flood: 13.3 ft; Our design flood elevation, 2018: 17.0 ft; Our design flood elevation since 2022: 18.5 ft; Level 1, finished floor: 19.4 ft; Generator plinths and electrical rooms: 20.6 ft; Level 2, the Dry Floor, finished floor: 36.1 ft. GEN dock Level 1 Halls A to C Level 2 the Dry Floor, suites 2A to 2H 0 10 20 30 40 50 60 ft 36.1 Dry Floor 20.6 Plinths, electrical rooms 19.4 Level 1 floor 18.5 Design flood elevation 17.0 Design flood, 2018 13.3 0.2% annual chance 12.6 Loading dock 11.0 Base flood elevation 10.2 Oct 2012 high water 8.1 Grade

Section through NWK1. Vertical scale true; horizontal schematic. Water shown at the base flood elevation, 11.0 ft.

Drawing
CGD-NWK1-A-301
Title
Building section A–A
Rev.
D
Date
2026-04-21
Drawn
EMC
Checked
TW
Scale
1 in = 20 ft vert.
Sheet
1 of 1
Elevations at NWK1, highest first
Levelft NAVD 88vs. BFE
Level 2, the Dry Floor, finished floor36.1+25.1
Generator plinths and electrical rooms20.6+9.6
Level 1, finished floor19.4+8.4
Our design flood elevation since 202218.5+7.5
Our design flood elevation, 2018 superseded17.0+6.0
0.2% annual chance flood13.3+2.3
Loading dock12.6+1.6
Base flood elevation (1% annual chance, Zone AE)11.00.0
High-water mark, October 30, 2012Surveyed on the neighboring warehouse in 2018.10.2−0.8
Site grade (average)8.1−2.9

Halls and suites

HallLevelAreaCritical ITCabinet densityTierOpened
Hall ALevel 120,600 sq ft2.9 MW10 kW average, 30 kW maximumStandard2020
Hall BLevel 120,600 sq ft2.9 MW10 kW average, 30 kW maximumStandard2020
Hall CLevel 120,600 sq ft3.0 MW10 kW average, 30 kW maximumStandard2022
Suites 2A to 2HLevel 233,600 sq ft in eight suites of 1,240 to 6,400 sq ft5.6 MW20 kW average, 60 kW with direct liquid coolingDry Floor2026

Specifications

From spec sheet NWK1-SPEC, revision E, September 30, 2026. Figures are design values unless they are dated.

Location

Address241 Capstan Street, Newark, NJ 07114
DistanceTwo miles east of the airport; 9.6 miles from Midtown Manhattan
Flood zoneZone AE, base flood elevation 11.0 ft NAVD 88
Level 18.4 ft above base flood elevation
Level 2 (Dry Floor)25.1 ft above base flood elevation

Building

ConstructionPurpose-built 2019 to 2020: precast concrete on 412 driven steel piles; Level 2 completed 2026
Gross area212,400 sq ft (19,733 m²)
Data halls95,400 sq ft (8,863 m²): three halls on Level 1 and eight suites on Level 2
Floor loadingLevel 1: 350 lb/ft² (16.8 kN/m²); Level 2: 250 lb/ft² (12.0 kN/m²)
Clear heightLevel 1: 18 ft 0 in; Level 2: 17 ft 6 in, to the underside of structure
FloorSlab, no raised floor; overhead busway and cable tray
WindEnvelope and roof rated for 150 mph (3-second gust)
Seismic design categoryB
LoadingThree dock positions at 12.6 ft behind a deployable barrier; two 12,000 lb freight elevators

Power

Utility serviceTwo 26.4 kV feeders from separate substations, automatic throw-over
Critical IT capacity14.4 MW (Level 1: 8.8 MW; Level 2: 5.6 MW)
UPSLevel 1: block redundant, five modules to carry four; Level 2: 2N. Lithium-ion batteries, 6 minutes at full load
GeneratorsFourteen 2.5 MW diesel sets on plinths at 20.6 ft; N+1 for Level 1, 2N for Level 2
Emissions controlSelective catalytic reduction and diesel particulate filters on every set
Fuel96,500 US gal (365,300 L) on site: 72 hours at full design load. Renewable diesel since March 2026
DistributionA and B feeds to every cabinet; 208 V three-phase on Level 1, 415 V on Level 2
Cabinet densityLevel 1: 10 kW design average, 30 kW maximum; Level 2: 20 kW average, 60 kW with direct liquid cooling

Cooling

PlantAir-cooled chillers with integrated free cooling (N+2); no cooling towers
Free cooling4,280 hours in 2025
Level 1Fan walls (N+1), hot-aisle containment
Level 2Fan walls (N+1) and a facility water loop to coolant distribution units in each suite
Supply air64.4 to 80.6 °F (18 to 27 °C), humidity within the recommended envelope for IT equipment

Fire and life safety

DetectionAspirating smoke detection in every hall, suite and meet-me room
SuppressionDouble-interlock pre-action sprinklers; clean agent in the electrical rooms and meet-me room
Generator yardHeat detection and water mist in every enclosure

Security

Perimeter8 ft fence; crash-rated bollards and gates; vehicle inspection bay
StaffSecurity officers on site 24 hours a day, every day
AccessCard and palm-vein readers; mantraps at the building entrance, each hall and each Level 2 suite; anti-passback
VideoCameras on every aisle, cage door, suite door, entrance and the perimeter; recordings kept for 90 days¹
VisitorsAuthorized by the customer in the portal; government photo ID on arrival

¹ Inside a private suite, coverage is agreed with the customer. The suite door and the corridor stay in view.

Connectivity

ModelCarrier-neutral
Networks on-net19
Fiber entrancesThree, in separate vaults; conduits sealed to 19.5 ft
Meet-me roomMMR-N on Level 1, with a second room on Level 2 planned for 2027
Cordgrass IPBlended transit from four upstream networks, 1 to 100 Gb/s
To SEC1Two diverse dark fiber routes, 8.8 and 12.2 miles

Operations and amenities

On siteCritical facilities engineers and remote hands technicians, 24 hours a day
NOC24 hours, by telephone, the portal and email
RoofAntenna positions for customers by license
AmenitiesCustomer lounge, three conference rooms, a build room, crash carts, loaner tools, lockers, showers, storage cages, Wi-Fi, parking

Getting there, and getting things delivered

Arrival
Enter from Capstan Street through the vehicle inspection bay. Visitors and customers park beside the main entrance on the east side. Bring government photo ID; your name must be on your company’s access list in the portal.
Deliveries
Around the clock at the dock, which has a security officer at all times. Label every package with your company name, account number and hall, cage or suite.
Port traffic
Trucks queue for the port terminals on the approach roads on weekday mornings. Allow twenty minutes more than your map suggests.
Roof
Antenna positions are licensed separately and reached by escort only.

Questions about access on the day: the NOC, +1 973 018 5536, at any hour.