Data centers

Spec sheets

One sheet per building, revised whenever a figure on it changes. The web pages and the sheets are generated from the same data, so they agree.

SheetRevisionDateFile
SEC1-SPEC, SEC1 SecaucusH2026-09-30PDF, 2 pages
NWK1-SPEC, NWK1 NewarkE2026-09-30PDF, 2 pages

What changed

SheetRev.DateChange
SEC1-SPECH2026-09-30Free cooling hours for 2025; renewable diesel; PUE for 2025.
NWK1-SPECE2026-09-30Level 2 commissioned: capacity, floor loading, suites.
SEC1-SPECG2025-11-03Generator enclosure water mist added; emissions controls on all sets.
SEC1-SPECF2024-06-03Perimeter barrier complete; electrical gallery and generator plinths at their new elevations.
NWK1-SPECD2022-09-12Hall C; design flood elevation revised to 18.5 ft.
SEC1-SPECE2023-10-23Hall 4 (Dry Floor).

Earlier revisions are available from your account manager. A sheet is a summary; where it and a signed order form disagree, the order form governs.