Incident report ·

SEC1: utility interruption during heat wave

  1. Resolved

    Utility power has been stable since 18:50 and the site transferred back at 19:31.

  2. Information

    SEC1 transferred to generator power at 16:02 after both utility feeders dipped below tolerance. All loads are on generator power and normal.

Duration

From Jul 20, 2022 · 16:02 EDT
to Jul 20, 2022 · 19:44 EDT

This incident affected

  • SEC1 Secaucus: Power (no impact)